Training and Upgrading Tokamak Power Plants with Remountable Superconducting Magnets
S. B. L. Chislett-McDonald, E. Surrey, J. Naish, A. Turner, D. P. Hampshire
arXiv:2205.04441 · 2022-05-09
Active bibliographic source — not scientific approval
Bibliographic access preserves source history; it does not approve extracted materials or validate reported claims. Review warnings on each occurrence separately.
Abstract
All high field superconductors producing magnetic fields above 12 T are brittle. Nevertheless, they will probably be the materials of choice in commercial tokamaks because the fusion power density in a tokamak scales as the fourth power of magnetic field. Here we propose using robust, ductile superconductors during the reactor commissioning phase in order to avoid brittle magnet failure while operational safety margins are being established. Here we use the PROCESS systems code to inform development strategy and to provide detailed capital-cost-minimised tokamak power plant designs. We propose building a 'demonstrator' tokamak with an electric power output of 100 MWe, a plasma fusion gain Qplasma = 17, a net gain Qnet = 1.3, a cost of electricity (COE) of \$ 1148 (2021 US) per MWh (at 75 % availability) and high temperature superconducting operational TF magnets producing 5.4 T on-axis and 12.5 T peak-field. It uses Nb-Ti training magnets and will cost about \$ 9.75 Bn (2021 US). An equivalent 500 MWe plant has a COE of \$ 608 per MW suggesting that large tokamaks may eventually dominate the commercial market. We consider a range of designs optimised for capital cost (as the reactors considered are pilot plants) consisting of both 100 MWe and 500 MWe plants with each of two approaches for the magnets: training and upgrading. With training magnets, the plant is cost-optimised for REBCO TF magnets. For a 100 MWe plant, the Nb-Ti training magnets typically produce 70 % peak field on the toroidal field coils compared to REBCO magnets, 65 % peak field on the central solenoid and cost approx. 10 % of the total machine cost. Training magnets could in principle be reused for each of say 10 subsequent (commercial) machines and hence at 1 % bring only marginal additional cost.
Similar papers
A general scaling relation for the critical current density in Nb3Sn
similarity 0.85A Godeke et al. · 2006 · arXiv:cond-mat/0608404
Source status unknown — claims are unverified
Self-consistent Modeling of the of HTS Devices: How Accurate do Models Really Need to Be?
similarity 0.84Francesco Grilli et al. · 2014 · arXiv:1405.5316
Source status unknown — claims are unverified
Searching for ductile superconducting Heusler X2YZ compounds
similarity 0.84Noah Hoffmann et al. · 2023 · arXiv:2306.04439
Source status unknown — claims are unverified
Vortex dynamics, pinning, and critical currents in a Ginzburg-Landau type-II superconductor
similarity 0.83T. Winiecki & C. S. Adams · 2001 · arXiv:cond-mat/0105586
Source status unknown — claims are unverified
Estimation of Self-Field Critical Current and Transport-Magnetization AC Losses of Roebel Cables
similarity 0.83Francesco Grilli et al. · 2015 · arXiv:1510.06232
Source status unknown — claims are unverified
Multiband Superconductivity and High Critical Current Density in Entropy Stabilized Nb0.25Ta0.25Ti0.25Zr0.25
similarity 0.83Nikita Sharma et al. · 2025 · arXiv:2508.19584
Source status unknown — claims are unverified