← Back to search

Verification Testing of MQXFA Nb3Sn Wires Procured Under LARP

Jeremy Levitan, Jun Lu, Vito Lombardo, Lance Cooley

arXiv:2302.07825 · DOI 10.1109/TASC.2019.2898556 · 2023-02-14 · IEEE Transactions on Applied Superconductivity

T35 citations

Active bibliographic source — not scientific approval

Bibliographic access preserves source history; it does not approve extracted materials or validate reported claims. Review warnings on each occurrence separately.

Abstract

The High-Luminosity LHC Accelerator Upgrade Project (AUP) in the U.S. will construct quadrupole magnets to be delivered to CERN. An initial 3 tons, over 600 km total length of conductor was procured under the LHC Accelerator R&D Program (LARP) for this project. Programs for quality control(QC) at the supplier and quality verification (QV) at the laboratories were solidified into components of the overall quality plan for strand procurement under AUP. Measurements of the critical current (Ic) and residual resistance ratio (RRR), and related probes and techniques, are central to the quality plan. Described below is the verification testing that has taken place at the National High Magnetic Field Laboratory (NHMFL). Testing challenges are presented by the high sensitivity of these wires. In addition, new RRR test software was developed to accommodate challenges presented by meeting international standards with existing configurations of test strands.

Similar papers